TANDULA WATER WORK-DURG |
MP Irrigation Dept |
Cement Concrete Lining by Paver Machine of Main Canal of Tandula Reservoir |
52.01 |
TELUGU GANGA PROJECT-3 BADVEL |
A.P.I &CAD Dept |
Earth Work, Embankment and Construction of CM & CD Works |
18.66 |
IVR-KALWAKURTHY PKG-28 |
A.P.I &CAD Dept |
Work of Construction of Distributary network including CM & CD works |
16.06 |
KOILSAGAR LIS STAGE-II |
A.P.I &CAD Dept |
Earth Work, Embankment and Construction of CM & CD Works |
10.70 |
NAVAYUGA KALWAKURTHY LIS |
A.P.I &CAD Dept |
Work of Execution of Stage -2 pumping station |
4.59 |
SAHARA ROAD PROJECT |
Maharashtra State Roads Dev Dept |
Earth Work, Embankment and Laying of GSB Roads and WMM with Paver finisher |
0.44 |
IVR-SRIPADA SAGAR PROJECT LIS |
A.P.I &CAD Dept |
Excavated earth on the bank of trench such that it facilitates the movement of Vehicles, stringing of Pipes along the alignment, lowering and Erection of M.S.Pipe |
7.08 |
KOIL SAGAR LIS STAGE-I |
A.P.I &CAD Dept |
Earth work Excavation & Forming Embankment, Tunnel Excavation and concrete, including Const of CM & CD for Gravity Canal. |
8.43 |
CYBER ENCLAVE PROJECT |
IVR PUDL |
Transportation of boulders, soft rock, and unusable earth from Cyber Enclave site to Patancheru dump yard |
0.09 |
PUDL-KUKATPALLY RESIDENTIAL COMPLEXES |
IVR PUDL |
Transportation of boulders, soft rock, and unusable earth from Kukatpally site to Patancheru dump yard |
0.10 |
ONGC-DAHEJ- PETRO CHEMICAL |
ONGC |
Refilling with approved Soil Grading, Watering & Compaction Layer wise including all material and labour. |
113.53 |
HD- UCIL-THUMMALAPALLY |
UCIL |
Construction of all types of Civil structural works |
44.01 |
INDORE JHABUA-GUJARAT(IVR) |
N H A I |
Clearing , Grubbing , Dismantling and Excavation at Indore 4 lane Road including all material and labour |
98.13 |
CHENGAPALLY-KERALA BORDER |
N H A I |
Clearing , Grubbing , Dismantling and Excavation at Chengapalli 4 Lane Road including all material and labour |
22.20 |
CHENGAPALLY-KERALA BORDER (A & H) |
N H A I |
Construction of Two to Four laning from L& T bypass end at Walayar |
12.08 |
PUNASA LIFT IRRIGATION SCHEME |
MP, PUNASA LIS |
Excavation of Soil & Hard Rock and disposal of excavated material in the specifed area |
13.00 |
PRANAHITHA -CHEVELLA LIS |
A.P.I &CAD Dept |
Earth Work Excavation, Forming Embankment etc including construction of CM & CD Works |
8.63 |
RIHAND SUPER THERMAL |
NTPCL |
Formation of Civil Work , Excavation work including labour |
1.00 |
IVR BARAMATHI-PHALTHAN |
Maharashtra State Roads Dev Dept |
Excavation of Soil & Hard Rock and disposal of excavated material in the specified area including labour |
4.43 |
ARIHANT FOUNDATION & HOUSING |
Arihant Foundation & Housing |
Road Work includes the Excavation, Filling & Compacting , Laying Granite Aggregate, Bitumen Tack coat |
4.13 |
IVR MCGM-TANSA |
Maharashtra Water Supply Scheme |
Excavation works for Replacement of MS all welded pipe line in the H.E |
5.02 |
IVR-CHANDRAPUR-KARANGI |
N H A I |
Earth Work for site preparation & Road development purpose. |
30.72 |
IVR WARANGOAN-SUB STATION |
MPSEB |
Excavation in all types of strata with transportation, Land development & Concrete works |
5.90 |
IVR-SION -PANVEL |
Maharashtra State Roads Dev Dept |
Earthwork in excavation, dressing and disposal of the excavated material and Dismantling of RCC strucutures on roadway |
15.06 |
TN-08 ROAD PROJECT (CHENGAPALLI-KERALA BORDER) |
N H A I |
Const,Providing and laying cement Concrete, Filling of Pot-Holes and Patch works, and Applying of tack coat with Bituminous Emulsion |
7.85 |
CONS OF 2 LANE ROAD WORK TO INDORE AIRPORT |
MPAKVN (I) LTD |
Construction of TWO Lane Road from INDORE AIRPORT To Pithampur Road |
13.46 |
CONS OF CEMENT CONCRETE ROADS IN PITHAMPUR INDUSTRIAL AREA AT PITHAMPUR AT DHAR DIST |
MPAKVN (I) LTD |
Construction of Internal Concrete Roads at Pithampur Industrial Area
| 3.38 |
Total 520.67 |